Position as at 13 October 2026
A regulatory calendar is only useful if every line on it can be defended.
The one we keep at Sol Associates applies three tests before a date goes in. Is there a published instrument I can cite, by article or by portal? Is the date adopted, rather than proposed? Does it apply to everyone, rather than to one file?
A draft still in consultation fails the second test. A date that belongs to one project fails the third. I read both, but they belong on a watch list that says what they are, not on a calendar a team schedules against.
I would rather add a date a week after publication than remove one after a team has planned around it.
Today the calendar holds the close of the KP1 storage call on 30 October 2026 at 14:00, the 25 May 2027 deadline for the establishment authorisation (AI) on connection contracts above 1 MW already in force on 25 May 2026, and the guarantee levels, each with its source. Last reviewed 1 October 2026.
Source: Sol Associates regulatory calendar, https://sol-associates.ro/regulatory-calendar/
If you want to check which dates apply to a file of yours, write to me.
Originally posted on LinkedIn: view the original post.
Day counts and deadlines are as of the post date; check the regulatory calendar for the current position. General information prepared from public sources, not legal advice. Read the disclaimer.