
Position as at 27 October 2026
We built the EPC section on public data. This is how we work with contractors on top of it.
Start with one decision, and grow only if it pays.
- A market-entry diagnostic, 2 to 4 weeks: one question answered with evidence (which segment, package, region and partner profile), delivered as a decision memo with a go, adjust or stop recommendation.
- Bid and package readiness, per tender or quarter: stage screening, scope and interface review, draft RfQs, qualification checks against ANRE attestation.
- Owner-side and interface support on a named project: turbine-supply and BoP interface review, schedule checks, grid-connection milestones.
There is also a beta capability demonstration with grid, market, business and contract views built from published Transelectrica, ANRE and ENTSO-E data. It shows an approach with scenario inputs. It is not a model of any project and not investment advice.
A first conversation costs nothing. Bring one project, one package or one market question: https://sol-associates.ro/epc/
The demonstration: https://sol-associates.ro/advisory/epc-market-entry-demo/
Sol is an advisory firm and does not act as an EPC contractor.
Originally posted on LinkedIn: view the original post.
Day counts and deadlines are as of the post date; check the regulatory calendar for the current position. General information prepared from public sources, not legal advice. Read the disclaimer.