Position as at 8 October 2026
A public notice is a calendar problem before it is a pricing problem.
Four questions I settle before I read the technical annexes:
- Who signs the offer, and are they reachable in the last 48 hours?
- Which document in the file takes longest to obtain, and who owns it?
- Does the estimated value fit the size of what we can deliver?
- Is the notice really about energy? A keyword is not a relevance test.
The note on the Sol page today puts the median window across the notices we captured at about 18 days. Two and a half weeks is easy to say and hard to schedule.
None of this says whether to bid. It says whether the calendar allows a good bid to exist.
Source: SEAP public procurement notices captured 15 September to 2 October 2026, aggregate counts.
If you are weighing a public tender in Romanian energy and want a second opinion, write to me.
Originally posted on LinkedIn: view the original post.
Day counts and deadlines are as of the post date; check the regulatory calendar for the current position. General information prepared from public sources, not legal advice. Read the disclaimer.