Position as at 5 October 2026
Twenty-five days before the KP1 storage call closes, the question I ask first is not about the upload.
It is about the feasibility study. The study must be complete when the application is submitted. Most filing stress I see comes from treating the upload date as the deadline, when the real deadline is the day the study has to be finished and signed off.
So, four questions:
- On what date does the study finish? A date, not a hope.
- Who signs it off, and can they defend each assumption in the filing?
- How much time is left after it for the filing itself?
- Which of the four exclusions could bite: co-location, grouped structures, replacement capacity, double funding?
None of this says a project should or should not file. It says the answer is usually decided by the study timeline, weeks before anyone opens MySMIS2021.
Window closes 30 October 2026 at 14:00. Source: Modernisation Fund KP1 scheme guide.
If you are working through a KP1 filing and want a second pair of eyes, write to me.
Originally posted on LinkedIn: view the original post.
Day counts and deadlines are as of the post date; check the regulatory calendar for the current position. General information prepared from public sources, not legal advice. Read the disclaimer.